Information about the project
We will renew the water supply network and carry out street works on Aleksis Kiven katu and Fleminginkatu between 2024 and 2026. As part of the water supply renovation, we will also improve cycling routes, renew tram tracks, and make changes to stops.
Project Summary
The main objective of this project is to replace the old water supply network in the area. Renovating the water supply system is important to avoid pipeline failures and major renovations in the coming years.
As part of the water supply network renovation, we will also address traffic planning challenges on Aleksis Kiven katu between Sturenkatu and Hämeentie and on Fleminginkatu between Vaasankatu and Aleksis Kiven katu.
The project will also include the following measures:
- Easing the angle of the tram track at the Fleminginkatu intersection
- Improving congested stop areas and creating a dedicated lane for public transport between Sturenkatu and Fleminginkatu
- Cutting down trees that are in poor condition, followed by planting new ones and ensuring they have space to grow
- Widening narrow pedestrian crossings and converting the tree-lined cycle path into a footpath
- Improving cycle traffic on Aleksis Kiven katu and providing cyclists with a route to the Baana via Dallapénpuisto park
Schedule
The works will begin in September 2024, and all phases are expected to be finished by the end of 2026.
Project team
The project is commissioned by the City of Helsinki. The contractor is GRK Suomi Oy.